Task IV.N
Go-Around/Rejected Landing
To determine the applicant exhibits satisfactory knowledge, risk management, and skills associated with go-around/rejected landing with emphasis on factors that contribute to landing conditions that may require a go-around.
References: AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Knowledge3 elements
The applicant demonstrates understanding of:
PA.IV.N.K1A stabilized approach, including energy management concepts.PA.IV.N.K2Effects of atmospheric conditions, including wind and density altitude, on a go-around or rejected landing.PA.IV.N.K3Wind correction techniques on takeoff/departure and approach/landing.
Risk Management9 elements
The applicant is able to identify, assess, and mitigate risk associated with:
PA.IV.N.R1Delayed recognition of the need for a go-around/rejected landing.PA.IV.N.R2Delayed performance of a go-around at low altitude.PA.IV.N.R3Power application.PA.IV.N.R4Configuring the airplane.PA.IV.N.R5Collision hazards.PA.IV.N.R6Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT).PA.IV.N.R7Distractions, task prioritization, loss of situational awareness, or disorientation.PA.IV.N.R8Runway incursion.PA.IV.N.R9Managing a go-around/rejected landing after accepting a LAHSO clearance.
Skills9 elements
The applicant exhibits the skill to:
PA.IV.N.S1Complete the appropriate checklist(s).PA.IV.N.S2Make radio calls as appropriate.PA.IV.N.S3Make a timely decision to discontinue the approach to landing.PA.IV.N.S4Apply takeoff power immediately and transition to climb pitch attitude for VX or VY as appropriate +10/-5 knots.PA.IV.N.S5Configure the airplane after a positive rate of climb has been verified or in accordance with airplane manufacturer’s instructions.PA.IV.N.S6Maneuver to the side of the runway/landing area when necessary to clear and avoid conflicting traffic.PA.IV.N.S7Maintain VY +10/-5 knots to a safe maneuvering altitude.PA.IV.N.S8Maintain directional control and proper wind-drift correction throughout the climb.PA.IV.N.S9Use runway incursion avoidance procedures, if applicable.
Overview
Study notes for Go-Around/Rejected Landing are coming soon. The official ACS elements for this task are listed above — use them as your checklist while the full study guide is being written.
Key Knowledge
Content coming soon.
Common DPE Questions
Content coming soon.
References
AIM; FAA-H-8083-2, FAA-H-8083-3, FAA-H-8083-23, FAA-H-8083-25; POH/AFM